050314 NWB1DOH---- Letter to NWB re Name Change-IMLE.pdf
060922 2AM-DOH---- Bonding Requirements-IMLE.pdf
061107 2AM-DOH---- 2002 WL Appl plus Feb2005 followup-IMLE.pdf
061107 2AM-DOH---- Appl cover letter-IMLE.pdf
061107 2AM-DOH---- Application Body-IMLE.pdf
061107 2AM-DOH---- S1 SRK Tailings Design Report/
061107 2AM-DOH---- S10 Environmental Protection Plan/
061107 2AM-DOH---- S10a_Final_Emergency_Response_Spill_Planning/
061107 2AM-DOH---- S10b_Air Quality Mgmt Plan/
061107 2AM-DOH---- S10c_Noise Abatement Plan/
061107 2AM-DOH---- S10d_Interim Waste Rock Storage Plan/
061107 2AM-DOH---- S10e_Hazardous Materials Mgmt Plan/
061107 2AM-DOH---- S10f_Explosives Mgmt Plan/
061107 2AM-DOH---- S10g_Landfill Mgmt Plan/
061107 2AM-DOH---- S10h_Landfarm Mgmt Plan/
061107 2AM-DOH---- S10i_Tailings Mgmt Plan/
061107 2AM-DOH---- S10j_Water Mgmt Plan/
061107 2AM-DOH---- S10k_Quality Assurance Quality Control Plan/
061107 2AM-DOH---- S10l_ Mine Closure and Reclamation Plan/
061107 2AM-DOH---- S10m_Monitoring and Follow-Up Plan/
061107 2AM-DOH---- S11 Site Specific WQ Objective for Cu/
061107 2AM-DOH---- S12 Aquatic Effects Monitoring Study Plan/
061107 2AM-DOH---- S2 SRK Surface Infrastructure/
061107 2AM-DOH---- S3 SRK Design Specifications/
061107 2AM-DOH---- S4 SRK Engineering Drawings/
061107 2AM-DOH---- S5 Hydroclimatic Parameter Reevaluation/
061107 2AM-DOH---- S6 Water Quality Model/
061107 2AM-DOH---- S7 SRK Quarry Rock Characterization/
061107 2AM-DOH---- S8 SRK Portal Rock Characterization/
061107 2AM-DOH---- S9 Environmental Health and Safety Mgmt System/
070129 2AM-DOH---- Meeting Notes NWB MHBL-IACE-Part 1.pdf
070129 2AM-DOH---- Meeting Notes NWB MHBL-IACE-Part 2.pdf