From: exec@nwb.nunavut.ca
Sent: Monday, December 08, 2003 5:02 PM
To: Dionne Filiatrault
Cc: Phyllis Beaulieu
Subject: Re: Doris
No, at this time everything is in NIRB's hands until the EA process is over which will be when the Minister accepts/rejects NIRB's recommendations. Officially, our turn will come when we get formal instructions from the Minister/NIRB.
Philippe
----- Original Message -----
From: Dionne Filiatrault
To: Philippe di Pizzo
Cc: Phyllis Beaulieu
Sent: Monday, December 08, 2003 3:16 PM
Subject: Doris

Hi Philippe,
Noticed the Final EIS was submitted (electronic format) to NWB attention and cc'd to NIRB.  Is the NWB required to request from NIRB at this time to proceed with regulatory process or will NIRB do it automatically? We received it Dec 3rd.  Let me or Phyllis know.
dionne
_______________________
Dionne Filiatrault, P. Eng.,
Senior Technical Advisor
Nunavut Water Board
P.O. Box 119,
Gjoa Haven, NU   X0B 1J0
Tel: (867) 360-6338
Fax: (867) 360-6369
email: srtech@nwb.nunavut.ca