Dear Phyllis,
I have just left a phone message for you regarding the same comments I have below.
1. Changes to the Spill response plan for Anialik River (NWB2ANI) and Tree River (NWB2TRE) applications. Under the "Detailed Response Plan", item (c), the locations of camps currently states that "camp is likely located on Crown Lands along the north shore of Canoe Lake (660 59’ 34” N, 1110 07’ 00” W)". Instead, it should read the following:
Anialik River project: "camps are likely located along Rush Lake (670 15’ 15” N, 1110 04’ 38” W) on IOL parcel CO-81and Mistake Lake (670 30’ 15” N, 1110 01’ 56” W) on IOL parcel CO-30".
Tree River project:"camp is likely located on Crown lands within the CJ2 claim (670 04’ 10” N, 1120 04’ 20” W)".
Thanks for your attention.
Regards,
Felicia Chang, Geologist