In reviewing our whiteboard for licensing it has come to my attention that your renewal for NWB2CHW has not gone out for public reveiw.  The existing licence has an expiry date of May 31, 2006.  If we put the application out for the standard 30 review period it would mean the renewal would not be issued until June 15, 2006.
 
Please advise if this will work, otherwise we would need to either shorten up the review period or, issue an extension if possible for one month.
 
On another note, our boiler plate exploration licenses are now being issued with a maximum 100m3/day total water use unless otherwise requested, and I noticed in your application (questionnaire) that the water use was put down as 50m3/day/drill.  will there be an issue with the amount of water if limited to 100m3/day? the existing licence is for 60m3/day total water use.
 
Also, we're trying to extend licence term if the projects are seen to be more than 2 seasons, our goal would be to issue a 5 year term unless otherwise requested.  Would this be something you'd like to change for when the information is made available for review?
 
Thank you, and I look forward to your response,
 
Regards,

____________________________________
David Hohnstein, C.E.T.
Technical Advisor Mining
Nunavut Water Board
P.O. Box 119
Gjoa Haven, NU X0B 1J0
 
Tel : 867.360.6338
Fax:  867.360.6369
email:  tech2@nwb.nunavut.ca
 
Office Phone: 780.443.4406
Office Fax:     780.443.4080