From: CritchS@DFO-MPO.GC.CA
Sent: Friday, June 13, 2003 11:11 AM
Cc: nwblic@polarnet.ca
Subject: Water Use Application NWB2HIG0103 - High Lake Project Campsite & Exploratory Drilling

Fisheries

and Oceans

Pêches

et Océans

Fish Habitat Management

P.O. Box 358

Iqaluit, Nunavut

X0A 0H0

Your file   Votre réference

   NWB2HIG0103

NU03315

                                                                                                              

Our file   Notre réference

 June 12, 2003

 

                                                                                  

 


 

Mr. Ian Neill, Geologist

Wolfden Resources Ltd.,

309 South Court St.

Thunder Bay, ON

P7J 1H1

Email:  wolfden@baynet.net

 

Re: Application Acknowledgement and Requirement for Notice of the Renewal Application for the High Lake Project

 

        RE: Water Use Application NWB2HIG0103 - High Lake Project Campsite & Exploratory Drilling

       

Dear Mr. Neill:

 

This letter is to advise that The Department of Fisheries and Oceans, Fish Habitat Management (DFO-FHM) received your water use application for a campsite and exploratory drilling in the High Lake volcanic belt submitted on your behalf by the Nunavut Water Board. DFO-FHM's assessment takes into consideration primarily fish and fish habitat related concerns. I have reviewed the plans for the proposed work.

 

As I understand it from your application, the project is proposed to take place between April 2003 and September 2004. During this time, a temporary campsite will be established on the southwest shore of High Lake. Ground geophysical surveying will be conducted to help plan the drilling phase. These surveys will occur in a thin strip extending approximately 8km south of camp and 15km north of camp. Two drills will be used, one in the main deposit area and another to test the geophysical targets, with drilling on ice a possibility.

 

Field operations in or near water may result in the harmful alteration, disruption or destruction of fish habitat, which is prohibited under Section 35 of the Fisheries Act. The following mitigation measures, in addition to the measures set out in the project proposal, are intended to prevent any potentially harmful impacts to fish and fish habitat:

 

·         If artesian flow is encountered, drill holes should be plugged and permanently sealed upon completion of the project

 

·         All disturbed areas should be stabilized and re-vegetated, as required, upon completion of work to prevent sedimentation.

 

·         No material should be left on the ice when there is potential for that material to enter the water (i.e. spring break-up).

·         If the drilling requires water in sufficient volume that the source waterbody may be drawn down please submit details (volume required, size of waterbody, etc.) to DFO-FHM for review. DFO-FHM does not recommend the use of streams as a water source.

 

·         All water intakes should be properly screened to prevent the entrainment of fish. Refer to the Freshwater Intake End-of-Pipe Fish Screen Guideline (DFO 1995), available on request. DFO recommends a maximum screen opening of 2mm.

 

 

Depositing deleterious substances into fish bearing waters is prohibited as stated under Subsection 36(3) of the Fisheries Act. The following are additional measures to mitigate habitat disturbance or loss as well as the deposition of deleterious substances.

 

·         Sediment and erosion control measures should be implemented prior to, and maintained during the work to prevent sediment entry into the water during a spring thaw.

 

·         All plans for proposed stream crossings or work conducted below the high water mark adjacent to the banks of streams and lakes require prior approval by DFO-HM. 

 

·         All wastes, drill cuttings, sewage containments, and fuel caches should be located at an appropriate distance from the normal high water mark of any water body, and be sufficiently bermed or otherwise contained to ensure that these substances do not enter any water body.

 

·         Drill cuttings should be disposed of in a sump such that they do not enter any water body. The use of biodegradable, salt free drill additives is encouraged over non-biodegradable types.

 

·         All activities, including maintenance procedures and refuelling, should be controlled to prevent the entry of petroleum products or other deleterious substances into the water.

 

·         All spills of oil, fuel, or other deleterious material should be reported immediately to the 24-Hour Spill Line at (867) 920-8130.

 

 

If the proposed work is carried out as described in the plans provided to DFO-FHM and if the additional mitigation measures specified above are implemented, the proposed work will not be considered as contravening Subsection 35(1) of the Fisheries Act which reads:

 

"No person shall carry on any work or undertaking that results in the harmful alteration, disruption or destruction of fish habitat."

 

Therefore, an authorization under Subsection 35(2) of the Fisheries Act will not be necessary. If a harmful alteration, disruption or destruction of fish habitat and/or the deposition of deleterious substances into fish bearing waters occurs as a result of a change in the plans for the proposed works or failure to implement the additional mitigation measures specified above, prosecution under Subsection 35(1) and/or Subsection 36(3) of the Fisheries Act may be initiated.

 

 

 

If you have any questions concerning the mitigation measures or should there be any changes to the proposed work, please contact me at (867) 979-8007 or by fax at

(867) 979-8039.

 

Sincerely,

 

 

 

Stephanie Critch

Habitat Biologist

Fish Habitat Management

Department of Fisheries and Oceans - Eastern Arctic Area

 

c.c.   Phyllis Beaulieu - A/Licensing Administrator, NWB