Hi Phyllis..
 
This addresses the EC issues, so we can go ahead with issuance of the NWB2REP file.  Please include this in the file.
 
Thanks,
 
J
----- Original Message -----
From: Meloche,Colette [Iqa]
To: Tech1@nwb.nunavut.ca
Sent: Wednesday, July 21, 2004 11:25 AM
Subject: NWB2REP

Hi Jim,
  Further to our conversation earlier today, Environment Canada's outstanding concerns with the location of discharge point for the NWB2REP file have been addressed.  Just to verify, the reason that the discharge location for the RBC has been changed is simply due to operational issues associated with pumping the effluent uphill to the previous discharge location.  The proposed discharge location is sufficient distance from the waterbodies and is ripraped at the discharge point to prevent erosion.  If my understanding of the situation is incorrect, please send me a note with a clarification.  Thanks Jim.

Take care,
Colette

Colette Meloche
Environmental Assessment / Contaminated Sites Specialist
Environmental Protection Branch
Environment Canada    Iqaluit, NU
Tel: (867) 975-4639
Fax: (867) 975-4645
Email: colette.meloche@ec.gc.ca