Received: by aulak.polarnet.ca (mbox nwbsrtec)
 (with Cubic Circle's cucipop (v1.31 1998/05/13) Mon May  5 14:36:35 2003)
X-From_: DRoberts@GOV.NU.CA Mon May  5 13:22:55 2003
Return-Path: <DRoberts@GOV.NU.CA>
Received: from relay2.internorth.net (relay2.internorth.net [216.108.1.33])
	by aulak.polarnet.ca (8.12.9/8.12.3) with ESMTP id h45JMt5v014283
	for <nwbsrtec@polarnet.ca>; Mon, 5 May 2003 13:22:55 -0600 (MDT)
Received: from relay1.internorth.net (relay1.internorth.net [216.108.1.16])
	by relay2.internorth.net (8.12.9/8.12.9) with ESMTP id h45JLTht309855
	for <nwbsrtec@polarnet.ca>; Mon, 5 May 2003 13:21:29 -0600 (MDT)
Received: from iqaluitrs21 (mailhost.gov.nu.ca [216.108.29.1])
	by relay1.internorth.net (8.12.8/8.12.8) with SMTP id h45JLP9U009789
	for <nwbsrtec@polarnet.ca>; Mon, 5 May 2003 13:21:27 -0600 (MDT)
Received: from 10.10.10.7 by iqaluitrs21 (InterScan E-Mail VirusWall NT); Mon, 05 May 2003 15:25:12 -0400
Received: by nunavutmta1.gov.nu.ca with Internet Mail Service (5.5.2650.21)
	id <KLHXHQ18>; Mon, 5 May 2003 15:22:16 -0400
Message-ID: <8D3E0568EB9FD611809C000103CF2FA434CA5B@IQALUITMAIL3>
From: "Roberts, David" <DRoberts@GOV.NU.CA>
To: "'nwbsrtec@polarnet.ca'" <nwbsrtec@polarnet.ca>,
   "Mulhern, Bob"
	 <BMulhern@GOV.NU.CA>,
   "Elsayed, Sameh" <SElsayed@GOV.NU.CA>
Cc: "Hawkins, John" <JHawkins@GOV.NU.CA>,
   "Toonoo, Timoon"
	 <TToonoo@GOV.NU.CA>
Subject: Resolute Bay Airport Water License
Date: Mon, 5 May 2003 15:22:02 -0400 
MIME-Version: 1.0
X-Mailer: Internet Mail Service (5.5.2650.21)
Content-Type: multipart/mixed;
	boundary="----=_NextPartTM-000-2957fe17-f763-449a-88e4-61205c785b77"

This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------=_NextPartTM-000-2957fe17-f763-449a-88e4-61205c785b77
Content-Type: multipart/alternative;
	boundary="----_=_NextPart_001_01C3133B.9B5BD1B0"

------_=_NextPart_001_01C3133B.9B5BD1B0
Content-Type: text/plain;
	charset="iso-8859-1"

Dionne  
Senior Technical Advisor, Nunavut Water Board
 
Re: Resolute Bay Airport Water License
 
The only item standing in the way of issuing the water license for the
Resolute Bay Airport seems to be the existing condition of the site sewage
lagoon as described in the inspection done last year by DIAND. That
inspection noted deficiencies.
 
Later last summer the walls of the lagoon were rebuilt in an attempt to
rectify this situation.  However this spring the lagoon is again overflowing
the primary walls in some sections.  This is in part due to a record amount
of rainfall late in the summer, and partly due to freeze up of sections of
the utilidor serving the Hamlet of Resolute Bay.  The utilidor problem has
resulted in the Health Centre sewage being added into the lagoon as well as
the RCMP office waste.  These two factors have combined to negate the
improvements made last year.
 
Since there is only one lagoon serving both the Hamlet and the Airport we
cannot shut it down.
 
The solution I propose at this time has three phases:
    1. Cut into the existing Hamlet utilidor sewage line and install a
standpipe with a three inch coupling so that the sewage can be introduced
into the existing line allowing the lagoon to reduce levels naturally.
    2. Rebuild the edges of the lagoon this summer after calculation of the
required capacity.
    3. Build a new sewage lagoon if on inspection the existing lagoon is
found to have passed its useful lifespan.
 
If this meets the Water Board requirements I request that the license be
issued with the proviso that we follow this plan and report back within 90
days on our progress.  I will require the Water Board approval to justify
the standpipe requirement so my department can go ahead with modification of
the existing utilidor.
Thanks
David 

David W. Roberts 
Regional Airport Manager/North 
Government of Nunavut 
P.O. Box 30 
Resolute, NU X0A 0V0

Tel: 867-252-3923 Fax: 867-252-3684

 

------_=_NextPart_001_01C3133B.9B5BD1B0
Content-Type: text/html;
	charset="iso-8859-1"

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META HTTP-EQUIV="Content-Type" CONTENT="text/html; charset=iso-8859-1">


<META content="MSHTML 5.00.3314.2100" name=GENERATOR></HEAD>
<BODY>
<DIV><FONT face=Arial size=2><SPAN class=691184818-05052003>Dionne&nbsp; 
</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN class=691184818-05052003>Senior Technical 
Advisor, Nunavut Water Board</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN 
class=691184818-05052003></SPAN></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2><SPAN class=691184818-05052003>Re: Resolute Bay 
Airport Water License</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN 
class=691184818-05052003></SPAN></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2><SPAN class=691184818-05052003>The only item 
standing in the way of issuing the water license for the Resolute Bay Airport 
seems to be the existing condition of the site sewage lagoon as&nbsp;described 
in the inspection done last year by DIAND. That inspection noted 
deficiencies.</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN 
class=691184818-05052003></SPAN></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2><SPAN class=691184818-05052003>Later last summer 
the walls of the lagoon were rebuilt in an attempt to rectify this 
situation.&nbsp; However&nbsp;this spring the lagoon is again overflowing the 
primary walls in some sections.&nbsp; This is in part due to a record amount of 
rainfall late in the summer, and partly due to freeze up of&nbsp;sections of the 
utilidor serving the Hamlet of Resolute Bay.&nbsp; The&nbsp;utilidor problem has 
resulted in the&nbsp;Health Centre&nbsp;sewage being added&nbsp;into the lagoon 
as well as the RCMP office waste.&nbsp; These two factors have combined to 
negate the improvements made last year.</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN 
class=691184818-05052003></SPAN></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2><SPAN class=691184818-05052003>Since&nbsp;there is 
only one lagoon serving both the Hamlet and the Airport we&nbsp;cannot shut it 
down.</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN 
class=691184818-05052003></SPAN></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2><SPAN class=691184818-05052003>The solution I 
propose at this time&nbsp;has three phases:</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN 
class=691184818-05052003>&nbsp;&nbsp;&nbsp;&nbsp;1. Cut into the existing 
Hamlet&nbsp;utilidor sewage line and install a standpipe with a three inch 
coupling so that the sewage&nbsp;can be introduced into the existing line 
allowing the lagoon to&nbsp;reduce levels naturally.</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN 
class=691184818-05052003>&nbsp;&nbsp;&nbsp;&nbsp;2. Rebuild the edges of the 
lagoon this summer after calculation of the required 
capacity.</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN 
class=691184818-05052003>&nbsp;&nbsp;&nbsp;&nbsp;3. Build a new sewage lagoon if 
on inspection the existing lagoon is found to have passed its useful 
lifespan.</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN 
class=691184818-05052003></SPAN></FONT>&nbsp;</DIV>
<DIV><FONT face=Arial size=2><SPAN class=691184818-05052003>If this meets the 
Water Board requirements I&nbsp;request that the license be issued with 
the&nbsp;proviso that we follow this plan and report back within 90 days on our 
progress.&nbsp; I will require the Water Board approval to&nbsp;justify the 
standpipe requirement so my department can go ahead with modification of the 
existing utilidor.</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN 
class=691184818-05052003>Thanks</SPAN></FONT></DIV>
<DIV><FONT face=Arial size=2><SPAN 
class=691184818-05052003>David&nbsp;</SPAN></FONT></DIV>
<P align=left><FONT color=#008000><FONT face="Arial Unicode MS"><FONT 
size=1><I>David W. Roberts</I> <BR><I>Regional Airport Manager/North</I> 
<BR><I>Government of Nunavut</I> <BR><I>P.O. Box 30</I> <BR><I>Resolute, NU X0A 
0V0</I></FONT></FONT></FONT></P>
<P align=left><FONT color=#008000 face="Arial Unicode MS" size=1><EM>Tel: 
867-252-3923 Fax: 867-252-3684</EM></FONT></P>
<DIV>&nbsp;</DIV></BODY></HTML>

------_=_NextPart_001_01C3133B.9B5BD1B0--

------=_NextPartTM-000-2957fe17-f763-449a-88e4-61205c785b77--

