20110109_FW_ Quality Assurance and Quality Control.pdf
20110119_RE_ Manpower Schedule.pdf
20110120_North Dam - Quality Assurance Program.pdf
20110127_FW_ New GCL Rolls for North Dam Certifications.pdf
20110128_RE_ GCL.pdf
20110201_Drill and Blast(1).pdf
20110201_Drill and Blast(2).pdf
20110201_FW Blasting Frozen Ground.pdf
20110201_FW_ North Dam Key Trench Blast Design.pdf
20110203_Perc Test Results and Key Trench Depth Determination.pdf
20110204_North Dam Percolation.pdf
20110206_Crusher Control - 20 mm Core Material.pdf
20110209 Nuna Quality Control ITP for Tail Lake Secondary Road.pdf
20110213_FW_ feild report Hope Bay.pdf
20110215 North Dam Additional Key Trench Excavation.pdf
20110215_North Dam _Soft_ Spot in Key Trench.pdf
20110216_FW field report.pdf
20110216_FW_ Quality Assurance and Quality Control.pdf
20110222_Panda Diversion Dam.pdf
20110225_RE_ Nuna Request for SRK_EBA Testing Data.pdf
20110226_FW_ North Dam Fillet Construction.pdf
20110226_RE_ Single Bead Thermistor.pdf
20110304_Adfreeze Piles.pdf
20110305_Doris North - North Dam.pdf
20110305_Hope Bay North Dam - Confrerence Call Notes.pdf
20110306_RE_ Hope Bay North Dam - Conference Call Notes.pdf
20110307_Core Material Placement.pdf
20110307_RE_ Core Material Placement.pdf
20110307_RE_ Core Material Placement_1.pdf
20110310_Acceptabe Belnd of Fines vs. Core Material.pdf
20110310_Removal of non-spec core material in key trench.pdf
20110311_Hypersaline Area in North Dam Key Trench.pdf
20110311_RE_ North Dam Test Result.pdf
20110312_Hypersaline Area in North Dam Key Trench.pdf
20110316_RE_ North Dam single-bead thermistor strings.pdf
20110324_FW_ Peat Zone Placement March 24, 2011.pdf
20110324_RE North Dam Quantities.pdf
20110328_One-Time Exception meeting Freeze-Back Temperature.pdf
20110329_North Dam - Excavation of Hypersaline Area.pdf
20110330_Fillet Zone Construction - Approved Variance.pdf
20110331_RE Location of Additional GTC.pdf
20110401_Plant Temperature.pdf
20110405_Adfreeze Pile.pdf
20110412_RE GCL Panel Layout.pdf
20110413_RE_ placement of saturated core - 20110413.pdf
20110414_RE_ Cores.pdf
20110418_RE Glycol Spill at Dam 2 Gallons April 4-11.pdf
20110425_RECore Material Placement.pdf
20110430 34 Crush Sample from Crusher Sieve Results.pdf
20110430_RE Progress Update - N Dam 2011.04.29.pdf
20110505_Explanatory note format of deliverables N Dam construction.pdf
20110509_RE_ Thermal Cover.pdf
20110531_Tail Lake Dam Thermistor Post - Bird Nest.pdf
20110801_Re Hope Bay - Tail Lake Discharge Pipe.pdf